Before You Sign, Know What the Contract Allows.

This article answers the following questions:

  • Can a contractor substitute materials without a homeowner’s approval?
  • Can a construction contract give a contractor the right to choose or substitute materials?
  • What happens if a contractor installs different materials than the ones specified?
  • What should a construction contract say about material substitutions?
  • Do material changes need to be documented in a change order?
  • What should homeowners look for before signing a custom home or renovation contract?
  • How can homeowners monitor material selections when they are away during construction?

The Marble Was Specified. Something Else Was Installed.

You spent months making selections for your custom home or major renovation.

The plans are complete. The specifications identify the materials. The contract is signed. Construction begins.

Then you walk into the property—or receive photos from the contractor—and notice something is different.

The marble you selected isn’t there.

The contractor has installed another material instead.

When you ask why, the response sounds reassuring:

“The original wasn’t available. This is basically the same thing.”

Is the contractor allowed to do that?

The answer may depend on something homeowners don’t always think to check until there’s already a problem:

What does the construction contract actually say?

The Contract May Give the Contractor More Control Than You Realize

A homeowner may spend hours selecting stone, flooring, fixtures, cabinetry and finishes and naturally assume those selections cannot be changed without approval.

But the written contract may say something different.

Construction contracts can give contractors varying degrees of authority over materials and substitutions. Depending on the agreement, a contractor may have discretion to select certain products, substitute materials under specified circumstances, or use products considered comparable or equivalent to those originally contemplated.

That makes the language of the contract critically important.

Before signing a contract for a substantial custom home or renovation, homeowners should understand:

  • Who has final authority over material selections?
  • When can the contractor make a substitution?
  • Does the homeowner have to approve substitutions in writing?
  • What do terms such as “comparable,” “equivalent” or “similar” actually permit?
  • What happens when a specified product is unavailable?
  • How are differences in price handled?
  • Does a substitution require a written change order?

A homeowner may believe a proposal, selection sheet, rendering or conversation guarantees a particular product. The contract may give the contractor considerably more flexibility.

That’s one reason having an attorney review a significant construction contract before you sign it can be so valuable.

The time to discover what the contractor is permitted to change is before construction begins—not after a substitute product has already been installed.

Specifications Are Part of the Project Roadmap

On a sophisticated construction project, the drawings tell only part of the story.

Specifications, schedules and product selections may identify details such as:

  • Stone, tile and flooring
  • Windows and doors
  • Plumbing fixtures
  • Appliances
  • Cabinetry and millwork
  • Roofing materials
  • Waterproofing systems
  • Lighting and electrical components
  • Exterior finishes

Those details matter.

Two products that look similar in a photograph may have very different costs, performance characteristics, installation requirements, warranties or expected lifespans.

On a high-value project, “basically the same” isn’t enough information.

The question is whether the material complies with what the parties actually agreed to—and that requires understanding all of the relevant project documents.

Sometimes a Substitution Is Completely Reasonable

Not every material change signals a problem.

Construction is a dynamic process.

A specified stone may become unavailable. A fixture may suddenly have a six-month lead time. A manufacturer may discontinue a product. Supply conditions can change. Conditions discovered during construction may make a particular product unsuitable.

There may be a legitimate reason to use something different.

But there is an important distinction between a necessary project change and an unauthorized substitution.

The contract should help determine the process.

If homeowner approval is required, the homeowner should understand what is changing, why the change is being proposed and what effect it may have before approving it.

If the contract gives the contractor discretion to make certain substitutions, the homeowner should understand the extent of that authority before signing the agreement.

A Material Substitution Can Affect More Than Appearance

Consider a custom home with hundreds of thousands of dollars invested in finishes.

One substitution may seem relatively minor.

But what happens when there are ten?

Or twenty?

The flooring changes. A different window manufacturer is used. Plumbing fixtures are substituted. Cabinet hardware changes. The exterior stone isn’t what was selected. A different waterproofing product appears on the job.

Eventually, the homeowner may be looking at a house that differs significantly from what was expected when the contract was signed.

Material changes can affect:

Cost. Is the replacement more or less expensive than the specified product?

Performance. Does it perform the same function under the conditions where it is being installed?

Warranty. Does the substitute carry different warranty terms?

Compatibility. Does changing one product affect surrounding materials or building systems?

Schedule. Will the substitution accelerate construction or create another delay?

Design. Does the replacement materially change the appearance or design intent?

On a substantial project, these aren’t insignificant details.

Put Significant Changes in Writing

Documentation is one of the most important controls a homeowner can have during construction.

When a significant material change is proposed, the project record should make it possible to determine:

What was originally specified?

Why is a substitution being proposed?

What product or material will replace it?

Does the change affect the contract price?

Does it affect the construction schedule?

Who has authority to approve the change?

Was that approval actually obtained?

Depending on the contract and the nature of the change, documentation might include a change order, substitution request, revised selection sheet, email approval or another process required by the agreement.

The important point is consistency.

A multimillion-dollar custom home should not gradually become a collection of undocumented decisions that no one can reconstruct when a disagreement develops.

What If You’re Not in Florida During Construction?

Material substitutions can be particularly difficult for seasonal residents and out-of-state homeowners.

You may be hundreds or thousands of miles away while construction continues.

By the time you visit the property, walls may be closed, finishes installed and invoices paid.

Contractor photographs can be helpful, but photographs don’t necessarily tell you whether the work matches the plans, specifications, selections and contract requirements.

That’s where independent owner-side oversight can provide another layer of protection.

Someone should be comparing what’s happening at the property with what’s supposed to be happening under the project documents.

If something doesn’t match, it’s generally better to identify the issue before additional work conceals it or construction moves into the next phase.

One Substitution May Be a Change. A Pattern May Signal a Bigger Problem.

Discovering one unexpected product doesn’t necessarily mean the project is in trouble.

Repeated undocumented substitutions are different.

They may point to broader problems with purchasing, project management, communication, documentation or compliance with the contract documents.

They can also reveal something equally important:

The homeowner and contractor may have very different understandings of what the contract allows.

That disagreement is much easier to address when everyone understands the rules before construction begins.

Know What You’re Agreeing to Before You Build

A beautiful rendering isn’t the contract.

A product selection isn’t necessarily the entire agreement.

And a conversation about the marble you wanted may not tell you what authority the contractor actually has to make substitutions.

For homeowners investing substantially in a Florida custom home or major renovation, the written contract is one of the most important project controls you have.

Have it reviewed before you sign.

Understand who controls material selections and substitutions.

Know how changes must be approved and documented.

And once construction begins, maintain a complete project record so you can determine whether what is being built matches what was agreed upon.

Building or Renovating a Significant Florida Property?

Wyman Legal Solutions helps homeowners protect substantial construction investments before and during construction through construction contract review, Custom Home Build Concierge and Renovation Concierge services.

Our goal is to help homeowners bring greater protection, clarity and control to major Florida construction projects—and identify potential problems before they become much more expensive disputes.

Call Wyman Legal Solutions at (561) 361-8700 or visit WymanLegalSolutions.com.

Protect Your Project Before Problems Begin.